Commercial Builds

School Works
Tresco Construction Ltd

Tresco Builders clearly understands the educational requirements involved in the build process as they have been involved in many building projects.

We have the common goal of improving all places where children learn. We believe that buildings must look impressive on the outside but what's most important is that learning is happening inside.

This was over 1,000square meter build which took 12 months for construction.

Southern Cross Campus NZ (2006)
  • Built a new classroom.
  • Attached an architecturally designed classroom to an existing building.
Tresco Construction Ltd
Factory Extension in South Auckland
Tresco Construction Ltd

Labour Only Commercial Contract

"stripped out existing partitions, undertook minor extensions and re-fit out the whole building”.

Mangere College 2007 NZ
  • Completed a science room fit out.
  • Demolition, new doors, repaired ceilings and minor carpentry work

    .
Tresco Construction Ltd
Manurewa Central School 2008-2009 NZ
Tresco Construction Ltd
  • Built two new classrooms and created a paraplegic bathroom for student use.
  • Removed part of existing classroom, built two new classrooms, refurbished existing ESOL rooms.
  • Speech Clinic Additions.
  • Built existing building to a standard classroom size, and completed all site works.